Singapore's MRT network: How has it evolved and what will it look like by 2030?

日本 ニュース ニュース

Singapore's MRT network: How has it evolved and what will it look like by 2030?
日本 最新ニュース,日本 見出し
  • 📰 ChannelNewsAsia
  • ⏱ Reading Time:
  • 37 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 18%
  • Publisher: 66%

Singapore’s MRT network will have eight rail lines when Phase 1 of the Cross Island Line opens in 2030.

‘More than a day to bore through 10cm of rock’: Making Stage 2 of the Thomson-East Coast Line a realityThe 16-station North-East Line , which connects north-eastern Singapore to heritage areas and the city fringe, marked several firsts in Singapore’s rail history.

As the line serves growing neighbourhoods, many of its stations were designed to allow for future expansions to cater to the growing population. Builders faced challenges such as varying soil conditions, which posed safety and structural issues at Promenade and Nicoll Highway stations, and having to tunnel through a maze of existing tunnels and cables.

Commuters will enjoy a direct route between areas in the west - such as Pasir Panjang and Kent Ridge - and the Central Business District. Those living in Paya Lebar and Mountbatten will also get faster access to the HarbourFront area.Measuring 42km and covering 36 stations, the Downtown Line is Singapore’s longest underground and driverless MRT line.

このニュースをすぐに読めるように要約しました。ニュースに興味がある場合は、ここで全文を読むことができます。 続きを読む:

ChannelNewsAsia /  🏆 6. in SG

日本 最新ニュース, 日本 見出し

Similar News:他のニュース ソースから収集した、これに似たニュース記事を読むこともできます。

Netizen's thoughts on how salaries of Ministers in Singapore are calculated - Singapore NewsNetizen's thoughts on how salaries of Ministers in Singapore are calculated - Singapore NewsThe post had garnered over 200 comments, some of which were humorous.
続きを読む »

Cross Island Line construction begins, 12 MRT stations from Aviation Park to Bright Hill ready by 2030Cross Island Line construction begins, 12 MRT stations from Aviation Park to Bright Hill ready by 2030The CRL Phase 1 will be linked to Pasir Ris and Hougang stations. Read more at straitstimes.com.
続きを読む »

S’pore engineers launch plan to make profession greenerSINGAPORE - Engineering in Singapore will become much greener with the launch of a plan by the Institution of Engineers, Singapore (IES) on Tuesday to advance sustainability here by 2030. Read more at straitstimes.com.
続きを読む »

Construction of Cross Island Line begins, with 12 stations in Phase 1Construction of Cross Island Line begins, with 12 stations in Phase 1SINGAPORE — Construction of Phase 1 of the Cross Island Line (CRL) — Singapore’s eighth MRT line — began on Wednesday (Jan 18).
続きを読む »

Decade-long upgrading works on North-South and East-West MRT lines to end in 2023Decade-long upgrading works on North-South and East-West MRT lines to end in 2023SINGAPORE - A decade-long upgrade to the 35-year-old North-South and East-West MRT lines is expected to be completed in 2023. Read more at straitstimes.com.
続きを読む »

Construction of Cross Island Line begins, with 12 stations in Phase 1Construction of Cross Island Line begins, with 12 stations in Phase 1Daily ridership for the Cross Island Line is expected to hit 600,000 when it opens for service in 2030, with that number eventually increasing to more than 1 million.
続きを読む »



Render Time: 2025-04-06 14:29:09