Toronto-listed Hudbay Minerals has announced the results of a prefeasibility study (PFS) for Phase 1 of its Copper World project, in Arizona. Phase 1, which is a standalone operation requiring state and local permits only, will produce 85 000 t/y over 20 years at an average cash and sustaining cash cost of $1.47/lb and $1.81/lb, respectively. The 20-year mine life is four years longer than the Phase 1 mine that was presented in the preliminary economic assessment (PEA), which was published in 2022.
Toronto-listed Hudbay Minerals has announced the results of a prefeasibility study for Phase 1 of its Copper World project, in Arizona.
The 20-year mine life is four years longer than the Phase 1 mine that was presented in the preliminary economic assessment , which was published in 2022. The capital cost estimate was lowered from $1.9-billion in the PEA, to $1.3-billion, owing to the deferral of the construction of a concentrator leach facility to year four, with the potential to be fully funded from operating cash flows or benefit from future government incentives for critical minerals processing.
日本 最新ニュース, 日本 見出し
Similar News:他のニュース ソースから収集した、これに似たニュース記事を読むこともできます。
Marvel's Phase 7 Avengers Replacement Has Been Set Up For 8 YearsThe Avengers' real replacement already exists.
続きを読む »
Arizona Diamondbacks vs Chicago Cubs Line MovementMLB line and odds movement for Arizona Diamondbacks vs Chicago Cubs on Sep 09, 2023.
続きを読む »
Arizona vs Chicago Betting Matchup & Odds September 09, 2023Arizona vs Chicago MLB History: Check Past Results And Stats For Insights On The Game - September 09, 2023!
続きを読む »
EXCLUSIVE VIDEO: 300 Mostly West African Migrants Cross Border into ArizonaA group of more than 300 mostly West African migrants walked through drainage gates in the border wall west of Lukeville, Arizona.
続きを読む »
MLB Diamondbacks vs Cubs Box Score - Sep 09, 2023Arizona Diamondbacks vs Chicago Cubs MLB game box score for Sep 09, 2023.
続きを読む »